  • GCF Office BuildingGolestan Cement Factory

    GCF Office BuildingGolestan Cement Factory

    Title: PGCF Office Building

    Client: Payvand Golestan Cement Factory

    Location: Gorgan, Iran

    Status: 2005 - 2008
    Site:

    The project is located in an industrial atmosphere, in a landscaped ground, with the mosque, restaurant and guesthouse, and far from the production line. Northern Iran, Golestan province, Gorgan plain, 150km from Gorgan city
    Program:

    A three story building, 2000m2, with different size rooms and open space offices in each floor, management department and conference room are located in the top floor.
    Systems:

    - Structure: Braced steel frame in one direction, moment resisting frame in the other, standard rolled shapes and plate girders for beams, “HSS” box section for columns and composite slabs for decks
    - Architecture: Cavity block walls and dry wall system, Marmarite stone tile flooring, dark red-brown travertine tiles with glass curtain wall in lobby, painted walls , acoustic ceiling tiles, dark red-brown travertine tiles, for the exterior facades and main roof.
    - Utility: DX central cooling and heating system (build multi system) including evaporators and condensers.

  • GCF Office BuildingGolestan Cement Factory
  • GCF Office BuildingGolestan Cement Factory
  • GCF Office BuildingGolestan Cement Factory
GCF Office BuildingGolestan Cement Factory I 2000 m2 I 3 storeys I Gorgan-Iran I 2005-2008          More     ◄ Back