    Title: NCF Office Building

    Client: Nahavand Cement Factory

    Location: Nahavand, Iran

    Status: 2005 - 2008
    Site:

    The project is located in an industrial atmosphere, in a landscaped ground with the mosque, restaurant and guesthouse, far from the production line. Western Iran, Hamedan province, 15km from Nahavand city
    Program:

    A three story building, 2000m2, with different size rooms and open space offices in each floor, management department and conference room are located in the top floor
    Systems:

    - Structure: Braced steel frame in one direction, moment resisting frame in the other, standard rolled shapes and plate girders for beams, “HSS” box section for columns, composite slabs for roof decks
    - Architecture: Cavity block walls and dry wall system, Marmarite stone tile flooring, dark red-brown travertine tiles with glass curtain wall in lobby, painted walls ,
    acoustic ceiling tiles, dark red-brown travertine tiles for the exterior facades and main roof.
    - Utility: Central Hydronics heating system including converters and radiators, due to cold climate the building doesn’t need a cooling system.

  • NCF Office Building Nahavand Cement Factory

    NCF Office Building Nahavand Cement Factory

    Title: NCF Office Building

    Client: Nahavand Cement Factory

    Location: Nahavand, Iran

    Status: 2005 - 2008
    Site:

    The project is located in an industrial atmosphere, in a landscaped ground with the mosque, restaurant and guesthouse, far from the production line. Western Iran, Hamedan province, 15km from Nahavand city
    Program:

    A three story building, 2000m2, with different size rooms and open space offices in each floor, management department and conference room are located in the top floor
    Systems:

    - Structure: Braced steel frame in one direction, moment resisting frame in the other, standard rolled shapes and plate girders for beams, “HSS” box section for columns, composite slabs for roof decks
    - Architecture: Cavity block walls and dry wall system, Marmarite stone tile flooring, dark red-brown travertine tiles with glass curtain wall in lobby, painted walls ,
    acoustic ceiling tiles, dark red-brown travertine tiles for the exterior facades and main roof.
    - Utility: Central Hydronics heating system including converters and radiators, due to cold climate the building doesn’t need a cooling system.

  • NCF Office Building Nahavand Cement Factory

    NCF Office Building Nahavand Cement Factory

    Title: NCF Office Building

    Client: Nahavand Cement Factory

    Location: Nahavand, Iran

    Status: 2005 - 2008
    Site:

    The project is located in an industrial atmosphere, in a landscaped ground with the mosque, restaurant and guesthouse, far from the production line. Western Iran, Hamedan province, 15km from Nahavand city
    Program:

    A three story building, 2000m2, with different size rooms and open space offices in each floor, management department and conference room are located in the top floor
    Systems:

    - Structure: Braced steel frame in one direction, moment resisting frame in the other, standard rolled shapes and plate girders for beams, “HSS” box section for columns, composite slabs for roof decks
    - Architecture: Cavity block walls and dry wall system, Marmarite stone tile flooring, dark red-brown travertine tiles with glass curtain wall in lobby, painted walls ,
    acoustic ceiling tiles, dark red-brown travertine tiles for the exterior facades and main roof.
    - Utility: Central Hydronics heating system including converters and radiators, due to cold climate the building doesn’t need a cooling system.

  • NCF Office Building Nahavand Cement Factory

    NCF Office Building Nahavand Cement Factory

    Title: NCF Office Building

    Client: Nahavand Cement Factory

    Location: Nahavand, Iran

    Status: 2005 - 2008
    Site:

    The project is located in an industrial atmosphere, in a landscaped ground with the mosque, restaurant and guesthouse, far from the production line. Western Iran, Hamedan province, 15km from Nahavand city
    Program:

    A three story building, 2000m2, with different size rooms and open space offices in each floor, management department and conference room are located in the top floor
    Systems:

    - Structure: Braced steel frame in one direction, moment resisting frame in the other, standard rolled shapes and plate girders for beams, “HSS” box section for columns, composite slabs for roof decks
    - Architecture: Cavity block walls and dry wall system, Marmarite stone tile flooring, dark red-brown travertine tiles with glass curtain wall in lobby, painted walls ,
    acoustic ceiling tiles, dark red-brown travertine tiles for the exterior facades and main roof.
    - Utility: Central Hydronics heating system including converters and radiators, due to cold climate the building doesn’t need a cooling system.

  • NCF Office Building Nahavand Cement Factory
  • NCF Office Building Nahavand Cement Factory
  • NCF Office Building Nahavand Cement Factory
  • NCF Office Building Nahavand Cement Factory
NCF Office Building Nahavand Cement Factory I 2000 m2 I 3 storeys I Nahavand-Iran I 2005-2008          More     ◄ Back

Archotec Architecture @ 2011-2015 All rights reserved    E: info@archotec.com      MAP